Pages

Share This

Showing posts with label General Election (GE14). Show all posts
Showing posts with label General Election (GE14). Show all posts

Saturday, June 2, 2018

MCA had no room to say 'no', down but not out: HSR cancellation should have followed due process


https://youtu.be/4SOgmJ35IWg
In the driver’s seat: Dr Wee is widely seen to be the next to helm the party. — ONG SOON HIN/The Star

HIS office is a small room with a great view of the capital city’s central business district. Within its four corners, MCA deputy president Datuk Seri Dr Wee Ka Siong is racing against time to plan the road ahead for the embattled party.

He is now MCA’s sole Member of Parliament after winning the Ayer Hitam seat in Johor.

The party also won the Titi Tinggi and Cheka state seats.

MCA contested 39 parliamentary seats and 90 state seats in the May 9 polls. The defeat has been bruising and Dr Wee has spent the last three weeks charting the road ahead for the 69-year-old party.

“Changing government is not a nightmare, not an impossible thing and can be done overnight,” says 50-year-old Dr Wee in his first media interview after the polls.

He adds that all is not lost following the party’s worst outing, and said MCA is ready to pick up from where it fell, and evolve as a completely reformed and independent entity.

“Our party is now our priority and not the coalition like before.

“There is no more political baggage. In the past there was no room to say ‘no’ or you would be deemed as going against the coalition’s whip.

From his office on the 9th floor of the MCA headquarters in Wisma MCA, Dr Wee says his major task is to put up a team that can move forward to rebuild the party.

“I have been encouraged by people to take up the challenge to provide the leadership, and I am duty-bound to do so,” he said during an interview.

Party president Datuk Seri Liow Tiong Lai announced that he would not seek re-election at the party polls this November, and Dr Wee as his deputy and sole survivor of GE14 is widely seen as his successor.

Dr Wee, a civil engineer who joined MCA in 1992, rose to become the party’s Youth chief in 2008 and deputy president in 2013.

MCA is the second largest component party of Barisan Nasional which lost its hold on the government for the first time since Independence in 1957 following the crushing defeat in GE14.

As one of three MCA ministers in the last four years, the former Minister in the Prime Minister’s Department explains that the party, bound by the Barisan Nasional spirit, seldom spoke openly on what transpired in the Cabinet.

This, unfortunately, was perceived by people that MCA had not been able to speak up for them or do anything for them.

Dr Wee said the perception had been compounded by negative statements on MCA and the Chinese community made by other Barisan component party leaders.

Statements which openly ridiculed the Chinese community and renowned figures like Robert Kuok and even MCA as a party in the run-up to the polls were certainly damaging.

The damage control also did not help at all.

“Saying that such issues had been voiced out or dealt with in the Cabinet were grossly insufficient.

“Some justice needs to be done and seen to be done.”

Dr Wee conceded that the Barisan spirit had also turned into a form of constraint on MCA and a baggage most of the time in a modern society where people demand openness and action against issues deemed unfair to the community.

At times, he adds, this “behind closed doors diplomacy” was done with the intention of not wanting to prolong an ugly episode and also to preserve harmony in a multiracial society.

“But obviously, this did not augur well for us.”

Going forward, Dr Wee says the role of the party is how to be an effective Opposition and provide the check and balance in the new regime.

He says he believes this is what the people want from the party and what the party can do for them now that it is in the Opposition.

Dr Wee says he will also be going to the ground to identify the party’s weaknesses and drawbacks that contributed to the defeat of the party.

He points out that these constitute important feedback in the party’s bid to reform itself and move forward.

The MCA central committee – the party’s highest decision-making body – has appointed him to helm the party’s reform committee following the GE14 defeat.

Dr Wee envisages a team of young and talented MCA leaders that can take on the new role of an effective Opposition in a new set-up.

The party, he adds, can provide a platform for them.

He says universal values, public policies and the party’s core struggle will remain the foundation.

Dr Wee also says the party will be rebuilt on all levels.

For instance, he says the party will be preparing for local elections (councillors) as the Pakatan Harapan Government has been pushing for it prior to GE14.

On Chinese education and Chinese new villages, of which MCA has been the guardian since its inception in 1949, Dr Wee says he hopes the new Government can do a better job in taking care of the two institutions close to the hearts of the Chinese.

He is willing and ready to provide help and cooperate with the new Government in the two areas upon their request.

“We (MCA) do what is best for the people. We exist because of the people.”

On the scrapping of two mega projects like the High Speed Rail between Kuala Lumpur and Singapore (HSR) and MRT 3 announced by Prime Minister Tun Dr Mahathir Mohamad just 22 days after Pakatan Harapan took over Putrajaya, Dr Wee feels the decisions needed in-depth study.

On the merits of HSR, he notes that Kuala Lumpur and Singapore are the two busiest Asean cities, and boosting their connectivity would be a step in the right direction and for mutual economic growth and benefits.

He points out that there are more than 30,000 flights between the two cities a year.

The HSR was scheduled to be completed in 2026, and it would have been just a 90-minute ride between the two cities.

The 350km track, which was to start in Bandar Malaysia in Kuala Lumpur and end in Jurong East, Singapore, would have passed through stations in Putrajaya, Seremban, Melaka, Muar, Batu Pahat and Iskandar Puteri.

On the MRT 3, Dr Wee said the people are enjoying the convenience of MRT 1 and looking forward to MRT 2 which is under construction.

Like any other big city in the world, Dr Wee said, MRTs are the desired mode of transportation.

He hopes the Pakatan Harapan Government can reconsider the scrapping of MRT 3 for the sake of the eight million Kuala Lumpur folk and the development of the capital city.

By Foong Pek Yee The Star


MCA think-tank: HSR cancellation should have followed due process - Centre For A Better Tomorrow (Cenbet)

CENBET - Centre For A Better Tomorrow  says the cancellation of the Kuala Lumpur-Singapore High-Speed Rail should have been announced after the cabinet's approval in accordance to due process. – The Malaysian Insight pic by Najjua Zulkefli, June 1, 2018.


THE cancellation of the Kuala Lumpur-Singapore High-Speed Rail project should have been made by the cabinet prior to its announcement as a matter of good governance, said the Centre For A Better Tomorrow (Cenbet).

The think tank said while it supported the new government's efforts to review potentially wasteful projects and lopsided deals, such decisions should have followed due process.

"If decision on a RM110 billion mega-project can be made without stringent due process, we are worried that this may set a bad precedent in deciding other government projects.

"Such decision undermines institutional integrity which should have never been compromised for political expediency," said Cennbet co-president Gan Ping Sieu in a statement today.

Based on news reports, Dr Mahathir Mohamad's May 28 announcement to call off the project was made after chairing his party's supreme council meeting and not in his capacity as prime minister announcing a Cabinet decision.

Transport Minister Anthony Loke was also reportedly said that the matter was not discussed in a cabinet meeting prior to the Prime Minister's May 28 announcement that the project would be shelved.

"Rightfully, cancelling a project of such magnitude, involving transnational interests, ought to have gone through a more structured decision-making process. This includes preparing a cabinet paper and getting feedback from all relevant agencies and state governments," explained Gan.

He pointed out that the federal constitution was clear that the cabinet is the highest executive body and the manner in which the announcement was made contradicted the spirit of accountability and transparency pledged by the new federal government.

"The eventual May 30 cabinet decision can be perceived as an afterthought and clearly without going through sufficient consultation," said Gan.

He added that institutional decision-making process was an integral part of good governance, which Cenbet promotes.

"All major national decisions must be made by the cabinet after due process and consultation to prevent abuse of power and leakages," he added. – Bernama, June 1, 2018.

Source: The Malaysian Insight

Related:

'Cancellation of HSR should have followed due process' - Nation 


Co-president Gan Ping Sieu -CENBET - Centre For A Better Tomorrow   MCA Think Tank
MEDIA STATEMENTS Co-President Gan Ping Sieu on the Cancellation of the HSR Project
Friday, June 01, 2018
 
The cancellation of the High Speed Rail project should have been made by the Cabinet prior to its announcement, as a matter of good governance. While we support the new government's efforts to review potentially wasteful projects and lop-sided deals, such decisions should have followed due process.  >> read more




Dr M jolts China's Belt-Road plan - Nation

 

 

  Illustration: Liu Rui/GT Newly-elected Malaysian Prime Minister Mahathir Mohamad has decided to scrap the Kuala Lumpur-Singapore Rail... 
In the future, the Malaysian government will certainly welcome investment by foreign-funded enterprises that abide by the local laws, but will differ from practices in the past decades in terms of bidding and contract talks. Most importantly, all parties should believe in the principle that business is business, and win-win cooperation is the key to the issue. Malaysia will definitely let investors enjoy the dividends of its reform and development.

 

'We will handle China deals with care' - Nation 


Related posts:

 Malaysia scraps MRT3 project, reviews HSR, ECRL mega projects to reduce borrowings




Chinese are the unsung heroes of South East Asia, Robert Kuok Memoirs

MCA had no room to say 'no', down but not out: HSR cancellation should have followed due process


https://youtu.be/4SOgmJ35IWg

In the driver’s seat: Dr Wee is widely seen to be the next to helm the party. — ONG SOON HIN/The Star

HIS office is a small room with a great view of the capital city’s central business district. Within its four corners, MCA deputy president Datuk Seri Dr Wee Ka Siong is racing against time to plan the road ahead for the embattled party.

He is now MCA’s sole Member of Parliament after winning the Ayer Hitam seat in Johor.

The party also won the Titi Tinggi and Cheka state seats.

MCA contested 39 parliamentary seats and 90 state seats in the May 9 polls. The defeat has been bruising and Dr Wee has spent the last three weeks charting the road ahead for the 69-year-old party.

“Changing government is not a nightmare, not an impossible thing and can be done overnight,” says 50-year-old Dr Wee in his first media interview after the polls.

He adds that all is not lost following the party’s worst outing, and said MCA is ready to pick up from where it fell, and evolve as a completely reformed and independent entity.

“Our party is now our priority and not the coalition like before.

“There is no more political baggage. In the past there was no room to say ‘no’ or you would be deemed as going against the coalition’s whip.

From his office on the 9th floor of the MCA headquarters in Wisma MCA, Dr Wee says his major task is to put up a team that can move forward to rebuild the party.

“I have been encouraged by people to take up the challenge to provide the leadership, and I am duty-bound to do so,” he said during an interview.

Party president Datuk Seri Liow Tiong Lai announced that he would not seek re-election at the party polls this November, and Dr Wee as his deputy and sole survivor of GE14 is widely seen as his successor.

Dr Wee, a civil engineer who joined MCA in 1992, rose to become the party’s Youth chief in 2008 and deputy president in 2013.

MCA is the second largest component party of Barisan Nasional which lost its hold on the government for the first time since Independence in 1957 following the crushing defeat in GE14.

As one of three MCA ministers in the last four years, the former Minister in the Prime Minister’s Department explains that the party, bound by the Barisan Nasional spirit, seldom spoke openly on what transpired in the Cabinet.

This, unfortunately, was perceived by people that MCA had not been able to speak up for them or do anything for them.

Dr Wee said the perception had been compounded by negative statements on MCA and the Chinese community made by other Barisan component party leaders.

Statements which openly ridiculed the Chinese community and renowned figures like Robert Kuok and even MCA as a party in the run-up to the polls were certainly damaging.

The damage control also did not help at all.

“Saying that such issues had been voiced out or dealt with in the Cabinet were grossly insufficient.

“Some justice needs to be done and seen to be done.”

Dr Wee conceded that the Barisan spirit had also turned into a form of constraint on MCA and a baggage most of the time in a modern society where people demand openness and action against issues deemed unfair to the community.

At times, he adds, this “behind closed doors diplomacy” was done with the intention of not wanting to prolong an ugly episode and also to preserve harmony in a multiracial society.

“But obviously, this did not augur well for us.”

Going forward, Dr Wee says the role of the party is how to be an effective Opposition and provide the check and balance in the new regime.

He says he believes this is what the people want from the party and what the party can do for them now that it is in the Opposition.

Dr Wee says he will also be going to the ground to identify the party’s weaknesses and drawbacks that contributed to the defeat of the party.

He points out that these constitute important feedback in the party’s bid to reform itself and move forward.

The MCA central committee – the party’s highest decision-making body – has appointed him to helm the party’s reform committee following the GE14 defeat.

Dr Wee envisages a team of young and talented MCA leaders that can take on the new role of an effective Opposition in a new set-up.

The party, he adds, can provide a platform for them.

He says universal values, public policies and the party’s core struggle will remain the foundation.

Dr Wee also says the party will be rebuilt on all levels.

For instance, he says the party will be preparing for local elections (councillors) as the Pakatan Harapan Government has been pushing for it prior to GE14.

On Chinese education and Chinese new villages, of which MCA has been the guardian since its inception in 1949, Dr Wee says he hopes the new Government can do a better job in taking care of the two institutions close to the hearts of the Chinese.

He is willing and ready to provide help and cooperate with the new Government in the two areas upon their request.

“We (MCA) do what is best for the people. We exist because of the people.”

On the scrapping of two mega projects like the High Speed Rail between Kuala Lumpur and Singapore (HSR) and MRT 3 announced by Prime Minister Tun Dr Mahathir Mohamad just 22 days after Pakatan Harapan took over Putrajaya, Dr Wee feels the decisions needed in-depth study.

On the merits of HSR, he notes that Kuala Lumpur and Singapore are the two busiest Asean cities, and boosting their connectivity would be a step in the right direction and for mutual economic growth and benefits.

He points out that there are more than 30,000 flights between the two cities a year.

The HSR was scheduled to be completed in 2026, and it would have been just a 90-minute ride between the two cities.

The 350km track, which was to start in Bandar Malaysia in Kuala Lumpur and end in Jurong East, Singapore, would have passed through stations in Putrajaya, Seremban, Melaka, Muar, Batu Pahat and Iskandar Puteri.

On the MRT 3, Dr Wee said the people are enjoying the convenience of MRT 1 and looking forward to MRT 2 which is under construction.

Like any other big city in the world, Dr Wee said, MRTs are the desired mode of transportation.

He hopes the Pakatan Harapan Government can reconsider the scrapping of MRT 3 for the sake of the eight million Kuala Lumpur folk and the development of the capital city.

By Foong Pek Yee The Star


MCA think-tank: HSR cancellation should have followed due process - Centre For A Better Tomorrow (Cenbet)

CENBET - Centre For A Better Tomorrow  says the cancellation of the Kuala Lumpur-Singapore High-Speed Rail should have been announced after the cabinet's approval in accordance to due process. – The Malaysian Insight pic by Najjua Zulkefli, June 1, 2018.


THE cancellation of the Kuala Lumpur-Singapore High-Speed Rail project should have been made by the cabinet prior to its announcement as a matter of good governance, said the Centre For A Better Tomorrow (Cenbet).

The think tank said while it supported the new government's efforts to review potentially wasteful projects and lopsided deals, such decisions should have followed due process.

"If decision on a RM110 billion mega-project can be made without stringent due process, we are worried that this may set a bad precedent in deciding other government projects.

"Such decision undermines institutional integrity which should have never been compromised for political expediency," said Cennbet co-president Gan Ping Sieu in a statement today.

Based on news reports, Dr Mahathir Mohamad's May 28 announcement to call off the project was made after chairing his party's supreme council meeting and not in his capacity as prime minister announcing a Cabinet decision.

Transport Minister Anthony Loke was also reportedly said that the matter was not discussed in a cabinet meeting prior to the Prime Minister's May 28 announcement that the project would be shelved.

"Rightfully, cancelling a project of such magnitude, involving transnational interests, ought to have gone through a more structured decision-making process. This includes preparing a cabinet paper and getting feedback from all relevant agencies and state governments," explained Gan.

He pointed out that the federal constitution was clear that the cabinet is the highest executive body and the manner in which the announcement was made contradicted the spirit of accountability and transparency pledged by the new federal government.

"The eventual May 30 cabinet decision can be perceived as an afterthought and clearly without going through sufficient consultation," said Gan.

He added that institutional decision-making process was an integral part of good governance, which Cenbet promotes.

"All major national decisions must be made by the cabinet after due process and consultation to prevent abuse of power and leakages," he added. – Bernama, June 1, 2018.

Source: The Malaysian Insight

Related:

'Cancellation of HSR should have followed due process' - Nation 


Co-president Gan Ping Sieu -CENBET - Centre For A Better Tomorrow   MCA Think Tank
MEDIA STATEMENTS Co-President Gan Ping Sieu on the Cancellation of the HSR Project
Friday, June 01, 2018
 
The cancellation of the High Speed Rail project should have been made by the Cabinet prior to its announcement, as a matter of good governance. While we support the new government's efforts to review potentially wasteful projects and lop-sided deals, such decisions should have followed due process.  >> read more




Dr M jolts China's Belt-Road plan - Nation

 

Chinese projects in Malaysia may stay intact

In the future, the Malaysian government will certainly welcome investment by foreign-funded enterprises that abide by the local laws, but will differ from practices in the past decades in terms of bidding and contract talks. Most importantly, all parties should believe in the principle that business is business, and win-win cooperation is the key to the issue. Malaysia will definitely let investors enjoy the dividends of its reform and development.

 

 

'We will handle China deals with care' - Nation 

 

Related posts:

 Malaysia scraps MRT3 project, reviews HSR, ECRL mega projects to reduce borrowings





Chinese are the unsung heroes of South East Asia, Robert Kuok Memoirs

Wednesday, May 30, 2018

Penang new Chief Minister taking Penang to the next level

https://youtu.be/mdtJqsLapZU/

Man with a plan: Chow elaborating on his vision for Penang during an interview with The Star at Komtar in George Town.
Man with a plan: Chow elaborating on his vision for Penang during an interview with The Star at Komtar in George Town.   


https://youtu.be/lLfYJvX5ePk

New CM Chow has a clear vision of how to develop the state into the next five years

 

"Economic growth with environmental sustainability would be an ideal situation rather than sacrificing the envoronment for the sake of development - Chow Kon Yeow"


GEORGE TOWN: It’s easy to understand why Chief Minister Chow Kon Yeow is such a popular figure in Penang despite hailing from Kuala Lumpur.

Holding the exco portfolio of Local Government, Traffic Manage­ment and Flood Mitigation for the last two terms here was not an easy task, but Chow’s simple, frugal and austere ways won over the people and even his harshest critics.

Now he is in the hot seat as the chief executive. Here, he shares his thoughts on his plans to move Penang up another notch over the next five years, as well as personal and party matters. Below is an excerpt from the Q&A:

How are you keeping after more than two weeks into the top post in Penang?

It’s a continuation of where I left off for 10 years as a state executive councillor in 2008. At the Chief Minister’s office, I deal with a wider range of issues than my portfolios under Local Govern­ment, Traffic Management and Flood Mitigation, which were more focused.

As Chief Minister, I also have to look into investment and economic issues, besides being chairman of Penang Development Corporation, PBA Holdings Bhd and other state statutory bodies.

Which plans do you intend to see through in your first term?

Upon taking office on May 14, I took up the Transport portfolio because I intend to see to the implementation of at least some of the projects under the Penang Trans­port Master Plan (PTMP). It is too ambitious to say that we will implement all the projects, but they will be a priority.

On the projects by Consortium Zenith Construction Sdn Bhd (CZC) comprising the RM6.43bil undersea tunnel and three paired roads, we will likely begin construction for one of the three major roads.

As for SRS Consortium, the project delivery partner of PTMP, we will start the Light Rail Transit (LRT) project. Since it is tied to Penang South Reclamation (PSR) in the southern coast of Penang island, the reclamation of three man-made islands will have to start as well to finance the LRT project.

(The PSR is a massive plan to reclaim three islands totalling 1,800ha off the southern coast of Penang island. The success of PTMP, the state government’s multi-billion ringgit public transport project involving LRT, monorail, cable cars and water taxis, depends on funding from property development on the islands.)

One important element here is that people see the reclamation as solely financing the infrastructure projects, which is true in a sense. The man-made islands will not only finance the infrastructure projects, but the lands made available will help meet the development needs of Penang for the next 30 years.

It is near to the Bayan Lepas industrial electronic and electrical cluster. Taking it away from the cluster will not produce the synergy effect.

And preferably, the expansion of our industrial zone into the future must also be near to the cluster and Penang International Airport facilities.

So we can safely say that the three man-made islands are a sure thing?So we can safely say that the three man-made islands are a sure thing? /b>

It is subject to review by the Federal Government. We need approval from the Federal Govern­ment for any large-scale project and the reclamation is one of them. It has to be approved by the National Physical Planning Council. If we can get all the necessary reports to support our application, it will be tabled at the National Physical Planning Council for approval.

You said the LRT component of PTMP is your priority. When can we expect to see it materialise?

We have made a submission to the Land Public Transport Commis­sion (SPAD) since March 2016 for a railway scheme.

Besides the LRT line from Komtar to Bayan Lepas, we have also submitted the other alignment as a full package, as our depot will be built on one of the man-made islands that has yet to be reclaimed. We are still waiting for the environment impact assessment approval.

I believe our application is still active. Hopefully, it will be brought before the Transport Ministry for deliberation and approval.

Previously, it was either an undersea tunnel or a third bridge to link Bagan Ajam and Gurney Drive. What will it be now? It is still too early to say. We can always make changes because of the cost factor. There is no firm decision on this. CZC will have to complete the feasibility studies first, which are now at 96%.

There is no hurry because even if we were to build the undersea tunnel, it would only take off in 2023.

Right now, CZC’s priority is to start building the 5.7km paired roads starting from Jalan Kampung Pisang in Ayer Itam and connecting with the Tun Dr Lim Chong Eu Express­way in Gelugor. It is one of the three major roads undertaken by CZC.

What are your thoughts on the claims that CZC paid RM22mil to cover up anti-graft investigations on the mega project comprising the undersea tunnel and three paired roads?

It is entirely up to the Malaysian Anti-Corruption Commission to investigate, as it has nothing to do with the state government. We are not the approving authorities.

The concession companies ap­pointed by us are responsible for getting all the approval. What CZC told us was that it was basically political extortion. They were under great duress and had no choice but to believe that the other party could help smooth the process of getting the necessary approval.

This had nothing to do with the state government and we had no prior knowledge of it until it was reported in the media.

Penangites have been plagued by floods on some occasions. What are your plans to resolve this?

The first phase of Sungai Pinang Flood Mitigation project was completed in the late ‘90s and it never went beyond that. This project has been delayed for 18 years.

We need about RM600mil to resolve the problem. The money can be used to build a barrage along the river near the People’s Housing Project in Sungai Pinang. If there is a barrage, backflow from the sea during high tide would not flow inland.

Other components include the construction of pump houses, retention ponds, collector drains along the river, deepening of rivers and the raising of bunds. All these measures are expected to be completed in three and a half years.

We believe these measures will help mitigate floods. All designs can only cater to a certain capacity, so we cannot say that there will be no floods after this.

It is important to secure approval and funding from the Federal Gov­ernment. The Sungai Pinang Flood Mitigation project is vital because it has impact upstream, as there are six tributaries linked to Sungai Pinang.

Many hillslope developments have taken shape, especially in the Tanjung Bungah area, which has drawn concern from environmental activists. What is your take on this?

The current state government will not change the tight guideline of restricting development 76m or 250ft above sea level, although the national guideline can go up to 500ft. The guideline is very restrictive as it will prevent a lot of hill lands from being developed.

This guideline only came into place under the Penang Structure Plan approved in 2007. Before that, approval had already been given to certain developments we can’t stop abruptly. Under this category, there are many projects approved that went beyond the restriction.

I will get the Penang Island City Council to brief me on how much land is still left that is restricted by the guideline. If there is not much land left, we will consider that the guideline will prohibit hillside deve­lopment in the future.

If the guideline is still in place, the people of Penang must confront the fact that there won’t be any development beyond this guideline. Land will become expensive. If there is no reclamation, what will the future hold for Penang island?

Gentrification is an issue in George Town, with foreigners snapping up properties within the Heritage zone. What do you think of this?

Prior to interest in our heritage buildings and before the inscription of the Unesco World Heritage Site, there were a few hundred houses in need of refurbishment. Some houses collapsed during storms.

If you look at the heritage site today, there are few dilapidated houses left due to the interest in heritage properties. The owners have greater appreciation of their value.

My personal stance is to save the house first. If there are buyers, we should save the buildings and negotiate on their use later.

The Opposition in Penang is down to only three representatives – two from Umno and one from PAS. Will they be given any allocation?

They will be given allocation, although the figure may not be the same as the Government’s assemblymen. They rejected it last time, thinking that we were setting a trap on them.

Previously we offered them RM40,000 in annual allocation, but it will be more this time. The funds can be used to support the community, as well as assist organisations in their work and in getting facilities such as fax machines. The funds are meant for the people.

The Opposition is weak in the state assembly. How do you view this matter?

In a healthy Western democracy, when there is a weak Opposition, backbenchers play a more active role in scrutinising government policy. It is a working mechanism. A new check-and-balance in the ruling coalition can emerge to play this role of checking the executives and government on the use of public funds and policy.

Regarding tourism, is there any new programme that your administration would like to introduce to attract visitors within the next five years?

We should be more selective not only in terms of quantity matters, but in terms of quality as well. We need to have niche tourism markets to get high spenders.

At the moment, we cannot be choosy as we need them to fill up our hotel rooms and patronise our local businesses. But there will come a time when it will negatively impact the local environment.

We should move up a notch by focusing on higher spending and business travellers rather than the usual travellers.

In your own opinion, what should an ideal Penang look like?

Economic growth with environmental sustainability would be an ideal situation rather than sacrificing the environment for the sake of development.

Development has to be balanced not only geographically, but also in the strata of society, meaning that the B40 class (households earning RM3,900 a month or less) must be able to benefit from the economic development.

There must be job opportunities and stable income for them. They must not be sidelined or living in poverty without jobs. If jobs can be made available to foreign workers, why can’t it be the same for locals?

You won the Pengkalan Kota state seat in 1990, but lost it in 1995. What was it like having to start from square one?

I was back to full-time party work in 1998 to lead the party after the “Knock Out Kit Siang” internal party strife. After 1999, I was picked as state DAP chairman to continue the party’s struggle in Penang.

What was it like being a DAP-elected representative before and after 2008?

Very different. The government representatives have more resources to serve the people better. But we keep instilling the idealism of our party struggle and the long-term vision to win Federal power into our representatives so that they see a bigger vision for the party and themselves.

Many Penang DAP leaders are now in their 60s. Has the state party leadership identified the next echelon of leaders?

The party made a bold decision by fielding many new candidates in the 14th General Election. They have potential for future development in the Government and party. This is a rejuvenation process to prepare them for the future.

Source: The Star by alex tengtan sin chow

Related:

CM: Transport plan components will be fully funded - Metro ... 

 

Rude awakening for storm victims - Metro News - Penang fresh flood again

 

All riled up over slow response - Metro News 

 

Huge landslide in Tg Bungah hill 

 

To Malaysia with love, from the world

Penang new Chief Minister taking Penang to the next level

https://youtu.be/mdtJqsLapZU/

Man with a plan: Chow elaborating on his vision for Penang during an interview with The Star at Komtar in George Town.
Man with a plan: Chow elaborating on his vision for Penang during an interview with The Star at Komtar in George Town.   


https://youtu.be/lLfYJvX5ePk

New CM Chow has a clear vision of how to develop the state into the next five years

 

"Economic growth with environmental sustainability would be an ideal situation rather than sacrificing the envoronment for the sake of development - Chow Kon Yeow"


GEORGE TOWN: It’s easy to understand why Chief Minister Chow Kon Yeow is such a popular figure in Penang despite hailing from Kuala Lumpur.

Holding the exco portfolio of Local Government, Traffic Manage­ment and Flood Mitigation for the last two terms here was not an easy task, but Chow’s simple, frugal and austere ways won over the people and even his harshest critics.

Now he is in the hot seat as the chief executive. Here, he shares his thoughts on his plans to move Penang up another notch over the next five years, as well as personal and party matters. Below is an excerpt from the Q&A:

How are you keeping after more than two weeks into the top post in Penang?

It’s a continuation of where I left off for 10 years as a state executive councillor in 2008. At the Chief Minister’s office, I deal with a wider range of issues than my portfolios under Local Govern­ment, Traffic Management and Flood Mitigation, which were more focused.

As Chief Minister, I also have to look into investment and economic issues, besides being chairman of Penang Development Corporation, PBA Holdings Bhd and other state statutory bodies.

Which plans do you intend to see through in your first term?

Upon taking office on May 14, I took up the Transport portfolio because I intend to see to the implementation of at least some of the projects under the Penang Trans­port Master Plan (PTMP). It is too ambitious to say that we will implement all the projects, but they will be a priority.

On the projects by Consortium Zenith Construction Sdn Bhd (CZC) comprising the RM6.43bil undersea tunnel and three paired roads, we will likely begin construction for one of the three major roads.

As for SRS Consortium, the project delivery partner of PTMP, we will start the Light Rail Transit (LRT) project. Since it is tied to Penang South Reclamation (PSR) in the southern coast of Penang island, the reclamation of three man-made islands will have to start as well to finance the LRT project.

(The PSR is a massive plan to reclaim three islands totalling 1,800ha off the southern coast of Penang island. The success of PTMP, the state government’s multi-billion ringgit public transport project involving LRT, monorail, cable cars and water taxis, depends on funding from property development on the islands.)

One important element here is that people see the reclamation as solely financing the infrastructure projects, which is true in a sense. The man-made islands will not only finance the infrastructure projects, but the lands made available will help meet the development needs of Penang for the next 30 years.

It is near to the Bayan Lepas industrial electronic and electrical cluster. Taking it away from the cluster will not produce the synergy effect.

And preferably, the expansion of our industrial zone into the future must also be near to the cluster and Penang International Airport facilities.

So we can safely say that the three man-made islands are a sure thing?So we can safely say that the three man-made islands are a sure thing? /b>

It is subject to review by the Federal Government. We need approval from the Federal Govern­ment for any large-scale project and the reclamation is one of them. It has to be approved by the National Physical Planning Council. If we can get all the necessary reports to support our application, it will be tabled at the National Physical Planning Council for approval.

You said the LRT component of PTMP is your priority. When can we expect to see it materialise?

We have made a submission to the Land Public Transport Commis­sion (SPAD) since March 2016 for a railway scheme.

Besides the LRT line from Komtar to Bayan Lepas, we have also submitted the other alignment as a full package, as our depot will be built on one of the man-made islands that has yet to be reclaimed. We are still waiting for the environment impact assessment approval.

I believe our application is still active. Hopefully, it will be brought before the Transport Ministry for deliberation and approval.

Previously, it was either an undersea tunnel or a third bridge to link Bagan Ajam and Gurney Drive. What will it be now? It is still too early to say. We can always make changes because of the cost factor. There is no firm decision on this. CZC will have to complete the feasibility studies first, which are now at 96%.

There is no hurry because even if we were to build the undersea tunnel, it would only take off in 2023.

Right now, CZC’s priority is to start building the 5.7km paired roads starting from Jalan Kampung Pisang in Ayer Itam and connecting with the Tun Dr Lim Chong Eu Express­way in Gelugor. It is one of the three major roads undertaken by CZC.

What are your thoughts on the claims that CZC paid RM22mil to cover up anti-graft investigations on the mega project comprising the undersea tunnel and three paired roads?

It is entirely up to the Malaysian Anti-Corruption Commission to investigate, as it has nothing to do with the state government. We are not the approving authorities.

The concession companies ap­pointed by us are responsible for getting all the approval. What CZC told us was that it was basically political extortion. They were under great duress and had no choice but to believe that the other party could help smooth the process of getting the necessary approval.

This had nothing to do with the state government and we had no prior knowledge of it until it was reported in the media.

Penangites have been plagued by floods on some occasions. What are your plans to resolve this?

The first phase of Sungai Pinang Flood Mitigation project was completed in the late ‘90s and it never went beyond that. This project has been delayed for 18 years.

We need about RM600mil to resolve the problem. The money can be used to build a barrage along the river near the People’s Housing Project in Sungai Pinang. If there is a barrage, backflow from the sea during high tide would not flow inland.

Other components include the construction of pump houses, retention ponds, collector drains along the river, deepening of rivers and the raising of bunds. All these measures are expected to be completed in three and a half years.

We believe these measures will help mitigate floods. All designs can only cater to a certain capacity, so we cannot say that there will be no floods after this.

It is important to secure approval and funding from the Federal Gov­ernment. The Sungai Pinang Flood Mitigation project is vital because it has impact upstream, as there are six tributaries linked to Sungai Pinang.

Many hillslope developments have taken shape, especially in the Tanjung Bungah area, which has drawn concern from environmental activists. What is your take on this?

The current state government will not change the tight guideline of restricting development 76m or 250ft above sea level, although the national guideline can go up to 500ft. The guideline is very restrictive as it will prevent a lot of hill lands from being developed.

This guideline only came into place under the Penang Structure Plan approved in 2007. Before that, approval had already been given to certain developments we can’t stop abruptly. Under this category, there are many projects approved that went beyond the restriction.

I will get the Penang Island City Council to brief me on how much land is still left that is restricted by the guideline. If there is not much land left, we will consider that the guideline will prohibit hillside deve­lopment in the future.

If the guideline is still in place, the people of Penang must confront the fact that there won’t be any development beyond this guideline. Land will become expensive. If there is no reclamation, what will the future hold for Penang island?

Gentrification is an issue in George Town, with foreigners snapping up properties within the Heritage zone. What do you think of this?

Prior to interest in our heritage buildings and before the inscription of the Unesco World Heritage Site, there were a few hundred houses in need of refurbishment. Some houses collapsed during storms.

If you look at the heritage site today, there are few dilapidated houses left due to the interest in heritage properties. The owners have greater appreciation of their value.

My personal stance is to save the house first. If there are buyers, we should save the buildings and negotiate on their use later.

The Opposition in Penang is down to only three representatives – two from Umno and one from PAS. Will they be given any allocation?

They will be given allocation, although the figure may not be the same as the Government’s assemblymen. They rejected it last time, thinking that we were setting a trap on them.

Previously we offered them RM40,000 in annual allocation, but it will be more this time. The funds can be used to support the community, as well as assist organisations in their work and in getting facilities such as fax machines. The funds are meant for the people.

The Opposition is weak in the state assembly. How do you view this matter?

In a healthy Western democracy, when there is a weak Opposition, backbenchers play a more active role in scrutinising government policy. It is a working mechanism. A new check-and-balance in the ruling coalition can emerge to play this role of checking the executives and government on the use of public funds and policy.

Regarding tourism, is there any new programme that your administration would like to introduce to attract visitors within the next five years?

We should be more selective not only in terms of quantity matters, but in terms of quality as well. We need to have niche tourism markets to get high spenders.

At the moment, we cannot be choosy as we need them to fill up our hotel rooms and patronise our local businesses. But there will come a time when it will negatively impact the local environment.

We should move up a notch by focusing on higher spending and business travellers rather than the usual travellers.

In your own opinion, what should an ideal Penang look like?

Economic growth with environmental sustainability would be an ideal situation rather than sacrificing the environment for the sake of development.

Development has to be balanced not only geographically, but also in the strata of society, meaning that the B40 class (households earning RM3,900 a month or less) must be able to benefit from the economic development.

There must be job opportunities and stable income for them. They must not be sidelined or living in poverty without jobs. If jobs can be made available to foreign workers, why can’t it be the same for locals?

You won the Pengkalan Kota state seat in 1990, but lost it in 1995. What was it like having to start from square one?

I was back to full-time party work in 1998 to lead the party after the “Knock Out Kit Siang” internal party strife. After 1999, I was picked as state DAP chairman to continue the party’s struggle in Penang.

What was it like being a DAP-elected representative before and after 2008?

Very different. The government representatives have more resources to serve the people better. But we keep instilling the idealism of our party struggle and the long-term vision to win Federal power into our representatives so that they see a bigger vision for the party and themselves.

Many Penang DAP leaders are now in their 60s. Has the state party leadership identified the next echelon of leaders?

The party made a bold decision by fielding many new candidates in the 14th General Election. They have potential for future development in the Government and party. This is a rejuvenation process to prepare them for the future.

Source: The Star by alex tengtan sin chow

Related:

CM: Transport plan components will be fully funded - Metro ... 

 

Rude awakening for storm victims - Metro News - Penang fresh flood again

 

All riled up over slow response - Metro News 

 

Huge landslide in Tg Bungah hill 

 

To Malaysia with love, from the world

Saturday, April 21, 2018

MUP, a Penang grassroots party joins the fray this GE14


MUP president Tan Gin Theam said the party now has over 20,000 members who are always on the ground, offering assistance to the public. — Picture via Facebook

GEORGE TOWN — The Malaysian United Party (MUP) might only be three years old, but over the past year, its members have been working hard on the ground, from offering free health screenings to giving free haircuts.

Usually recognisable by their bright red-and-yellow vests, MUP members often visit coffee shops and wet markets, handing out calendars and flyers of their events.

As a new party, its funds are limited, but MUP said it made up for its lack of funds by offering community service to the public.

MUP president Tan Gin Theam said the party now has over 20,000 members who are always on the ground, offering assistance to the public.

“We are strictly a grassroots party that focuses on serving the people, nothing else. We don’t have any other agenda,” he said in an interview with Malay Mail.

Distancing the party from other new political parties in the state, Tan said they are not “friendly” allies to either Barisan Nasional (BN) or Pakatan Harapan (PH).

“If you look at the other so-called independent parties in Penang, they are either BN-friendly or PH-friendly. We are neither,” he said, referring to Penang Front Party, Parti Cinta Malaysia, People’s Alternative Party and Parti Rakyat Malaysia.

The MUP was formed in 2015 and officially registered with the Registrar of Societies in 2016.

Tan, who founded the party, used to be a staunch DAP, and then Pakatan Rakyat supporter prior to 2015.

He used to attend ceramahs organised by DAP and supported the Ubah movement by the federal Opposition.

“The late Karpal Singh was my idol. He was the reason why I became so interested in politics, and he was the reason why I supported DAP,” he said, referring to the party’s late national chairman.

He said he became disillusioned with DAP after Karpal passed away in 2014.

“Without Karpal, the party was not the same and after supporting them for so many years, I realised they did not fulfil their promises made during the elections,” he said.

He said there does not seem to be an alternative to PH or BN so he decided to form his own party and do what he said political parties are supposed to do: Serve the public.

“That’s why from the start, we don’t take any sides. We only take the people’s side to help them in any way we can,” he said.

MUP has organised various community activities over the past year and in recent months, stepped up their approach by holding small kopitiam ceramahs.

They are often met with bemused and curious stares, but Tan said no one has been openly hostile to them.

“What we are doing now is educating the public, to tell them what is going on and to make sure they go to the polls with their eyes open,” he said.

MUP has opened seven operations centres in Kebun Bunga, Padang Kota, Pantai Jerejak, Datuk Keramat, Jawi, Air Itam and Tanjung.

“We hope to open at least one operations centre in each constituency in Penang,” Tan said.

The party also hopes to contest more than 30 state seats out of the total 40 state constituencies in Penang.

“We know it will be multi-cornered fights in most seats in Penang but we want to give the people a grassroots party that will always be on their side,” he said.- By Opalyn Mok MalayMail

Related Articles

MUP throws hat in the ring in Penang ⋆ The Malaysian Times

Full list of MUP’s candidates:
PARLIAMENT:
1.Bagan – Koay Xing Boon)
2.Jelutong- Tan Sim Bee)
3.Bukit Gelugor – Lai Xue Ching)
4. Bayan Baru – Yim Boon Leong)
5. Bukit Bendera – Tan Gim Theam
STATE:
1.Bagan Jermal (Hari Devydrai)
2. Bagan Dalam (Teoh Uat Lye)
3. Sungai Puyu (Neoh Bok Keng)
4.Datuk Keramat (Lim Boo Chang)
5. Sungai Pinang (Tan Sim Bee)
6. Batu Lanchang (Kee Lean Ee)
7. Paya Terubong (Kuan Aun Wan)
8. Air Itam (Kang Teik Woi)
9. Seri Delima (Tan Yang Yung)
10. Batu Uban (Teoh Kok Siang)
11. Pantai Jerejak (Yim Boon Leong)
12. Kebun Bunga (Wu Kai Min)
13. Air Putih (Tan Gim Theam)
14. Pulau Tikus (Wee Kean Wai)
15. Tanjong Bunga (Lee Zheng Yong)
16. Machang Bubuk (Lim Jhun Hou)
17. Jawi (Koay Xin Boon)
18. Padang Kota (Goh Saik Wei)
19. Pengkalan Kota (Koay Teng Lye)
20. Komtar (Ong Chun Jiet)
— Bernama