Pages

Share This

Showing posts with label Structural Engineering. Show all posts
Showing posts with label Structural Engineering. Show all posts

Saturday, October 20, 2018

Soil erosion mitigation plans ignored, waters from stream identified as main cause !

A drone picture of the collapsed beams along Jalan Tun Sardon leading to Balik Pulau on the left while Jalan Paya Terubong on the right leads to Relau.— CHAN BOON KAI/The Star
(Above) A closer view of the collapsed beams. (Right) The affected section of the project overlooking Jalan Paya Terubong heading to Relau in the background.
 
Tragic Situation: (Top) A landslide at the construction site in Jalan Bukit Kukus, Paya Terubong, caused four containers to be covered with mud - Bernama,  Closed call:(Right below) Survivors of the landslide surveying the scene



 Checks show projects did not follow SOP 


GEORGE TOWN: As the search and rescue operation for seven buried foreign workers at a construction site in Paya Terubong is going on, shocking information has surfaced that not a single construction site in Penang is following the soil erosion mitigation plan stipulated in their project approvals.

The Star has learnt that the state government has launched Ops Lumpur shortly after the general election, requiring enforcement officers from the local councils to inspect and report on every construction site in all five districts in the state.

A consultant civil engineer familiar with Ops Lumpur claimed that every single construction project did not observe the soil erosion mitigation plan.

He said Ops Lumpur was overseen directly by state exco members and enforcement officers were required to visit the sites.

"Their reports shocked the state exco members. Every contractor failed to do soil erosion measures in every site.

“Now you know why streams near construction site are always yellow when it rains,” he said.

The consultant engineer said the state went after developers who claimed they were not aware and blamed the contractors.

“Civil engineers are often disgusted when they do site visits because it is common for us to see that the soil erosion mitigation plans are never followed,” he said.

The consultant said it was easy to inspect construction sites and check on the progress and questioned whether state government agencies regularly conducted scheduled and surprise visits.

“How often do they conduct spot checks? How strictly do they conduct enforcement rounds on construction sites? If we keep contractors on their toes all the time, we might not have so many landslides,” he said, referring to the latest landslide in Bukit Kukus, the site of a hillside highway from Paya Terubong to Bukit Jambul is being built.

A teh tarik-coloured stream was observed flowing between Jalan Paya Terubong and the barred entrance to the highway construction site yesterday.

It has been raining almost every day in Penang this week.

In yesterday’s incident, rescue team found one survivor and two dead bodies. At press time, seven are still missing.

The Fire and Rescue Department received a distress call about the landslide at 1.56pm.

An Indonesian worker who only wished to be known as Endo, 36, said three of his relatives from Sulawesi were trapped in the landslide and he was working in another nearby construction site.

“It rained all night (Thursday). The rain stopped at 9am (yesterday) and resumed at 1pm. At my site, all of us stayed in our quarters and didn’t work because of the rain.

“I got a call from others that my relatives are missing. So, now I’ll just wait,” he said.

Last Thursday, 14 concrete beams measuring 25m long each, crashed down from an elevated section of the highway.

No injuries were reported and a stop-work order was issued pending investigations of the collapse.

Chief Minister Chow Kon Yeow, who visited the site with several state exco members, said he reminded rescue workers to be wary while searching for the missing victims because the rain could have rendered the slopes unstable.

“All work has stopped here and the contractor was about to send in its report on the collapse of the concrete beams on Oct 11,” he said, adding that the place where the beams collapsed was far from the landslide. - The Star by arnold lohlo tern chern

Water from stream identified as main cause of landslide


GEORGE TOWN: Water flow from a stream on the hilly area in Jalan Bukit Kukus, Paya Terubong, near here has been identified as among the cause of the landslide.

Azhari Ahmad, who is Mineral and Geoscience Department (JMG) director for Perlis, Kedah and Penang, said the finding was made based on its inspection and monitoring since Saturday.

“The JMG team identified several factors that caused the landslide, resulting in all containers on the hill slope to slide down with the earth.

“The main factor that caused the landslide is the water flow from a stream near the slope and heavy rain since Friday morning caused the water to overflow,” he told reporters yesterday.

Azhari said the department had taken immediate measure by diverting the flow of water from the stream elsewhere to avoid worsening the situation, especially during the search and rescue (SAR) operation.

He said further inspection conducted at 7.30am yesterday found the water flow on the slope was lesser but the department would continue to monitor the situa­tion with equipment from the Special Malaysia Disaster Assistance and Rescue Team to ensure the safety of SAR personnel.

He said based on observation and inspection at the scene, the department found the location of the landslide to be at the concave slope which easily collected water.

“But we do not rule out the possibility of a follow-up landslide in the area due to the soil structure and there is still water flowing that can cause landslide.

“We have also advised the rescue team to stop operation immediately if it rains as it could cause another landslide,” he said.

Azhari said the department was assisting the rescue team in the SAR operation and did not rule out the possibility of it conducting further investigation to determine the ac­­tual cause of the landslide.

“We hope for fine weather and no rain so that the SAR operation can be continued until all the victims are found,” he said.

The landslide occurred at about 1.30pm last Friday.

The tragedy occurred following heavy rain in the state from Thurs­day afternoon until noon the following day, causing the landslide at the container and kongsi area at the Bukit Kukus paired road construction site.

Source: Bernama, Reports by LO TERN CHERN, N.TRISHA and R.SEKARAN



Related stories:

 

Zairil: Contractor to face action if accident due to negligence - Metro

 


Wake up and stop the landslides, state govt urged - Nation



Wake up and stop the landslides, state govt urged - Nation

 


DOSH: Builders told to stop work, but did not - Nation

 


CAP urges Penang govt to issue stop work order on hillside



October and November turning into ‘disaster season’


‘Put safety measures into place at construction sites’

 

 

Related post:

 

Precarious situation: The collapsed beams along Jalan Tun Sardon which fell and broke after being knocked down. https://www.thestar.c

 

 

Soil erosion mitigation plans ignored, waters from stream identified as main cause !

A drone picture of the collapsed beams along Jalan Tun Sardon leading to Balik Pulau on the left while Jalan Paya Terubong on the right leads to Relau.— CHAN BOON KAI/The Star
(Above) A closer view of the collapsed beams. (Right) The affected section of the project overlooking Jalan Paya Terubong heading to Relau in the background.
 
Tragic Situation: (Top) A landslide at the construction site in Jalan Bukit Kukus, Paya Terubong, caused four containers to be covered with mud - Bernama,  Closed call:(Right below) Survivors of the landslide surveying the scene



 Checks show projects did not follow SOP 


GEORGE TOWN: As the search and rescue operation for seven buried foreign workers at a construction site in Paya Terubong is going on, shocking information has surfaced that not a single construction site in Penang is following the soil erosion mitigation plan stipulated in their project approvals.

The Star has learnt that the state government has launched Ops Lumpur shortly after the general election, requiring enforcement officers from the local councils to inspect and report on every construction site in all five districts in the state.

A consultant civil engineer familiar with Ops Lumpur claimed that every single construction project did not observe the soil erosion mitigation plan.

He said Ops Lumpur was overseen directly by state exco members and enforcement officers were required to visit the sites.

"Their reports shocked the state exco members. Every contractor failed to do soil erosion measures in every site.

“Now you know why streams near construction site are always yellow when it rains,” he said.

The consultant engineer said the state went after developers who claimed they were not aware and blamed the contractors.

“Civil engineers are often disgusted when they do site visits because it is common for us to see that the soil erosion mitigation plans are never followed,” he said.

The consultant said it was easy to inspect construction sites and check on the progress and questioned whether state government agencies regularly conducted scheduled and surprise visits.

“How often do they conduct spot checks? How strictly do they conduct enforcement rounds on construction sites? If we keep contractors on their toes all the time, we might not have so many landslides,” he said, referring to the latest landslide in Bukit Kukus, the site of a hillside highway from Paya Terubong to Bukit Jambul is being built.

A teh tarik-coloured stream was observed flowing between Jalan Paya Terubong and the barred entrance to the highway construction site yesterday.

It has been raining almost every day in Penang this week.

In yesterday’s incident, rescue team found one survivor and two dead bodies. At press time, seven are still missing.

The Fire and Rescue Department received a distress call about the landslide at 1.56pm.

An Indonesian worker who only wished to be known as Endo, 36, said three of his relatives from Sulawesi were trapped in the landslide and he was working in another nearby construction site.

“It rained all night (Thursday). The rain stopped at 9am (yesterday) and resumed at 1pm. At my site, all of us stayed in our quarters and didn’t work because of the rain.

“I got a call from others that my relatives are missing. So, now I’ll just wait,” he said.

Last Thursday, 14 concrete beams measuring 25m long each, crashed down from an elevated section of the highway.

No injuries were reported and a stop-work order was issued pending investigations of the collapse.

Chief Minister Chow Kon Yeow, who visited the site with several state exco members, said he reminded rescue workers to be wary while searching for the missing victims because the rain could have rendered the slopes unstable.

“All work has stopped here and the contractor was about to send in its report on the collapse of the concrete beams on Oct 11,” he said, adding that the place where the beams collapsed was far from the landslide. - The Star by arnold lohlo tern chern

Water from stream identified as main cause of landslide


GEORGE TOWN: Water flow from a stream on the hilly area in Jalan Bukit Kukus, Paya Terubong, near here has been identified as among the cause of the landslide.

Azhari Ahmad, who is Mineral and Geoscience Department (JMG) director for Perlis, Kedah and Penang, said the finding was made based on its inspection and monitoring since Saturday.

“The JMG team identified several factors that caused the landslide, resulting in all containers on the hill slope to slide down with the earth.

“The main factor that caused the landslide is the water flow from a stream near the slope and heavy rain since Friday morning caused the water to overflow,” he told reporters yesterday.

Azhari said the department had taken immediate measure by diverting the flow of water from the stream elsewhere to avoid worsening the situation, especially during the search and rescue (SAR) operation.

He said further inspection conducted at 7.30am yesterday found the water flow on the slope was lesser but the department would continue to monitor the situa­tion with equipment from the Special Malaysia Disaster Assistance and Rescue Team to ensure the safety of SAR personnel.

He said based on observation and inspection at the scene, the department found the location of the landslide to be at the concave slope which easily collected water.

“But we do not rule out the possibility of a follow-up landslide in the area due to the soil structure and there is still water flowing that can cause landslide.

“We have also advised the rescue team to stop operation immediately if it rains as it could cause another landslide,” he said.

Azhari said the department was assisting the rescue team in the SAR operation and did not rule out the possibility of it conducting further investigation to determine the ac­­tual cause of the landslide.

“We hope for fine weather and no rain so that the SAR operation can be continued until all the victims are found,” he said.

The landslide occurred at about 1.30pm last Friday.

The tragedy occurred following heavy rain in the state from Thurs­day afternoon until noon the following day, causing the landslide at the container and kongsi area at the Bukit Kukus paired road construction site.

Source: Bernama, Reports by LO TERN CHERN, N.TRISHA and R.SEKARAN



Related stories:

 

Zairil: Contractor to face action if accident due to negligence - Metro

 


Wake up and stop the landslides, state govt urged - Nation



Wake up and stop the landslides, state govt urged - Nation

 


DOSH: Builders told to stop work, but did not - Nation

 


CAP urges Penang govt to issue stop work order on hillside



October and November turning into ‘disaster season’


‘Put safety measures into place at construction sites’

 

 

Related post:

 

Precarious situation: The collapsed beams along Jalan Tun Sardon which fell and broke after being knocked down. https://www.thestar.c

 

 

Thursday, January 25, 2018

Penang Landslide occured days after remedial works started

Cracks at Tanjung Bungah site began in June, Commissioner of Inquiry told

Expert panel: (From right) Yeo, Dr Gue and Prof Ramli arriving for the inquiry.
 
GEORGE TOWN: A temporary structure supporting a worksite slope in Tanjung Bungah developed cracks in mid-June, a Commissioner of Inquiry heard.

Soil Mechanic Sdn Bhd director Cheah Wing How, who was a sub-contractor of the project where a landslide killed 11 workers, said he was informed by a clerk to carry out remedial works as the granite wall had cracked.

Cheah said his team left after completing the granite works and soil-nailing works to enhance the stability of the temporary slope.

There was, however, no mention when they completed the works.

“When we returned, we found there were pile cap excavation works carried out near the slope.

“We believe there was soil movement that resulted in the cracks on the granite wall.

“We were carrying out remedial works and 11 days into the job, the landslide happened,” said Cheah, who has 20 years’ experience in the field.

Cheah was testifying on the first day of the public hearing into the landslide tragedy by the State Commission of Inquiry (SCI) at City Hall in Esplanade yesterday.

On Oct 21, last year, a landslide hit the affordable condominium project made up of two 49-storey towers with 980 units in total within the Permai Village township near the Tunku Abdul Rahman University College.

Among the 11 killed was site supervisor Yuan Kuok Wern, 27.

During the proceeding, the Penang Island City Council (MBPP) also presented eight drone videos that showed the slope and the surrounding area after the tragic incident.

SCI chairman Datuk Yeo Yong Poh said they planned to carry out a site visit tomorrow.

He also fixed the hearing to continue until Monday, followed by Feb 8 to Feb 11, March 24 to March 28 and April 18 to 25.

Other members of the commission are geotechnical expert Datuk Dr Gue See Sew and forensic geo-technical engineer from Universiti Teknologi Malaysia Prof Ramli Nazir.

The SCI was gazetted on Dec 21 last year to investigate the landslide after Yang di-Pertua Negri Tun Rahman Abbas gave his consent on Dec 6, 2017, for the appointment of the members of the commission and its terms of reference.

Meanwhile, Penang Citizens Awareness Chant Group (Chant) adviser Yan Lee said the entrance to the Teik Granite Quarry, which is located near the site where the landslide occurred, should be fenced up.

“Anyone can just walk into the site as the safety measure is not up to mark.

“We have voiced our concern to the Penang Island City Council, the Department of Environment as well as the Land and Mines Department,” he said yesterday.

By Chong Kah Yuan and Jo-Leen Wong The Star
 
Related Links:

Contractors in jitters over temporary slopes - Nation

 

Boulders slid down hill prior to disaster - Nation




Related posts:

Penang landslide tragedy, plea went unheeded, no one listened !

 

Behind BJ Cove houses at Lintang Bukit Jambul 1 is an IJM Trehaus Project.  Approximate Coordinates : 5°20'38.47"N,100°16'..

Penang Landslide occured days after remedial works started

Cracks at Tanjung Bungah site began in June, Commissioner of Inquiry told


Expert panel: (From right) Yeo, Dr Gue and Prof Ramli arriving for the inquiry.
 
GEORGE TOWN: A temporary structure supporting a worksite slope in Tanjung Bungah developed cracks in mid-June, a Commissioner of Inquiry heard.

Soil Mechanic Sdn Bhd director Cheah Wing How, who was a sub-contractor of the project where a landslide killed 11 workers, said he was informed by a clerk to carry out remedial works as the granite wall had cracked.

Cheah said his team left after completing the granite works and soil-nailing works to enhance the stability of the temporary slope.

There was, however, no mention when they completed the works.

“When we returned, we found there were pile cap excavation works carried out near the slope.

“We believe there was soil movement that resulted in the cracks on the granite wall.

“We were carrying out remedial works and 11 days into the job, the landslide happened,” said Cheah, who has 20 years’ experience in the field.

Cheah was testifying on the first day of the public hearing into the landslide tragedy by the State Commission of Inquiry (SCI) at City Hall in Esplanade yesterday.

On Oct 21, last year, a landslide hit the affordable condominium project made up of two 49-storey towers with 980 units in total within the Permai Village township near the Tunku Abdul Rahman University College.

Among the 11 killed was site supervisor Yuan Kuok Wern, 27.

During the proceeding, the Penang Island City Council (MBPP) also presented eight drone videos that showed the slope and the surrounding area after the tragic incident.

SCI chairman Datuk Yeo Yong Poh said they planned to carry out a site visit tomorrow.

He also fixed the hearing to continue until Monday, followed by Feb 8 to Feb 11, March 24 to March 28 and April 18 to 25.

Other members of the commission are geotechnical expert Datuk Dr Gue See Sew and forensic geo-technical engineer from Universiti Teknologi Malaysia Prof Ramli Nazir.

The SCI was gazetted on Dec 21 last year to investigate the landslide after Yang di-Pertua Negri Tun Rahman Abbas gave his consent on Dec 6, 2017, for the appointment of the members of the commission and its terms of reference.

Meanwhile, Penang Citizens Awareness Chant Group (Chant) adviser Yan Lee said the entrance to the Teik Granite Quarry, which is located near the site where the landslide occurred, should be fenced up.

“Anyone can just walk into the site as the safety measure is not up to mark.

“We have voiced our concern to the Penang Island City Council, the Department of Environment as well as the Land and Mines Department,” he said yesterday.

By Chong Kah Yuan and Jo-Leen Wong The Star

Related Links:

Contractors in jitters over temporary slopes - Nation

 

Boulders slid down hill prior to disaster - Nation





Related posts:

Penang landslide tragedy, plea went unheeded, no one listened !

 

Behind BJ Cove houses at Lintang Bukit Jambul 1 is an IJM Trehaus Project.  Approximate Coordinates : 5°20'38.47"N,100°16'..

Sunday, November 12, 2017

Wanted: Leaders who listen !

Turning a blind eye: The grumblings over exposed hills are growing louder but little is being done to rectify the situation


 

Grievances from residents warning of environmental damages must not fall on deaf ears


“Leaders who don’t listen will eventually be surrounded by people who have nothing to say.


MY family home in Kampung Melayu, Air Itam in Penang, is more than 56 years old. That’s about my age, and it has never been hit by floods. Not once!

But last week, my parents – dad is 92 years old and mum, 86, – had their sleep rudely interrupted sometime after 1am by water gushing into their home.

They have been sleeping on the ground floor for years now because they are too old to climb the stairs to their bedroom.

The water that flowed into their room almost touched the top of their bed but fortunately, one of my nephews and his wife from Kuala Lumpur were staying over that night.

It was so fortunate that they were there to calm my anxious parents down and assure them all would be fine. They managed to comfort my stunned folks, who had never experienced such an unpleasant situation before. My father had to be carried to the room upstairs as the house remained flooded throughout the early morning.

Our home was filled with layers of mud the next day and the cars parked outside were all damaged. They sadly look like write-offs.

My father’s pride and joy, his first-generation Proton Saga car – which he bought in 1985 – is now unusable.

A week on, my brothers and nieces are still cleaning up the mess from the massive flood. They haven’t had the time or mood to even assess the financial losses.

And bound by a common sentiment as Penangites, they are tired of the blame game, a trade the state’s politicians have plied to near-perfection.

How many times can the finger be pointed at the previous government, with the incumbent almost 10 years in power? And how many more times can we blame it on torrential rain, which came from Vietnam – or wherever? Worst of all is, when discussions are mooted on flood issues, the voices of the people are swiftly silenced.

It appears that even to talk about hillslope development, one would have to contest in the elections, or be perceived to be challenging the state government, or more extremely, be some kind of lackey in cahoots with the Federal Government.

Blaming everyone else except oneself is simply a way of covering up one’s weaknesses. But the discerning public, in a maturing democracy with heightened transparency and a huge middle class like Penang, will not tolerate such short-term manoeuvring for long.

Suddenly, civil society – a buzzword among politicians – has vanished, with NGOs now regarded as irritants and an affront to the state establishment. Politics is apparently the monopoly of politicians now.

As the National Human Rights Society aptly puts it, “With the benefit of hindsight, we are sure that the Penang government now realises that they should not so readily malign civil society, howsoever obliquely – for the legitimate and well-founded articulation of matters of great concern to civil society.

“This is because it undermines the fundamental values of a functioning democracy and the fundamental human rights of the populace at large.”

Perhaps, the state political elites, many of whom aren’t pure blood Penangites, don’t realise the state is the home of a vibrant civil society, with many active NGOs and activists who are respected influencers of society.

Having walked through the corridors of power and appreciated power’s pleasures, perks and the adulation it brings, maybe it is becoming much harder for people to take criticism. This is, in fact, a reflection of the arrogance of power.

Many have developed thin skin now, with little tolerance for the slightest form of criticism. If anyone even dares raise their voice, an army of cybertroopers, hiding behind anonymity, are unleashed to attack them.

Freedom of speech, it seems, is only the domain of the opposition, with some media (regarded as unfriendly) unceremoniously ridiculed and questioned for their attendance at press conferences.

There are politicians from the Federal Government, too, who are shamelessly cashing in on the flood situation in Penang.

Their relief work must be splashed across news pages, and they have to be seen wading through the flood waters for dramatic purpose. Phua Chu Kang’s iconic yellow boots could likely be the hottest item in the state, as politicians bask in the media’s glare.

Ridiculous remarks have also been passed, one even blaming the state government, saying it has earned the wrath of God.

The rain and floods will go away, eventually. Penangites are stakeholders in the state, and they don’t only make up politicians. The state doesn’t belong to the state government or the opposition.

Caught up in the thick of the action, we seem to have forgotten that the hills are crumbling even without rain. As a stern reminder, just last month, a landslide buried some people in Tanjung Bungah. Investigations on that tragedy are still ongoing.

Basically, the trees – which act as sponge on the hills – are gone. We don’t need to be soil experts to know that.

The grumblings are growing louder because the hills have been progressively going bald in recent years. But the voice of discontent has fallen on deaf ears.

Penangites are alarmed at what they are seeing, and they don’t like it one bit, as much as they understand that land is scarce on the island and property developers need to source some to build homes on.

While it’s easy to hang the Penang state government out to dry for its follies, it’s difficult to ignore how the floods in the east coast states have become annual affairs, too. So, what effective flood mitigation plans have been put in place there?

Kelantan has suffered senselessly, and after more than a year of having been subjected to Mother Nature’s havoc, many victims have yet to recover from their losses. Flooding is obviously nothing exclusive and doesn’t discriminate. Every state has, unfortunately, experienced it in some shape or form.

So, irrespective of location, when life returns to normal, you can expect the politicians to resume their old denying ways.

If there’s a thread that binds our politicians – regardless of which side of the political divide they come from – it is their inability to apologise for their mistakes, despite waxing lyrical about accountability.

Don’t expect them to say sorry, because an apology would be admission of guilt, or worse, a sign of weakness in their realm of inflated egos.

And to put things into perspective, perhaps we could learn a lesson from a quote by prominent American pastor Andy Stanley – “Leaders who don’t listen will eventually be surrounded by people who have nothing to say.”


On the beat Wong Chun Wai

Wong Chun Wai began his career as a journalist in Penang, and has served The Star for over 27 years in various capacities and roles. He is now the group's managing director/chief executive officer and formerly the group chief editor.

On The Beat made its debut on Feb 23 1997 and Chun Wai has penned the column weekly without a break, except for the occasional press holiday when the paper was not published. In May 2011, a compilation of selected articles of On The Beat was published as a book and launched in conjunction with his 50th birthday. Chun Wai also comments on current issues in The Star.

Related posts:

Behind BJ Cove houses at Lintang Bukit Jambul 1 is an IJM Trehaus Project.

Becoming bald: A view of the clearing work seen at Bukit Relau which was visible from the Penang Bridge in November last year. GEORGE...
https://youtu.be/QB45Q2_mOG0 Suspicious activity: A photo taken from Penang social activist Anil Netto's blog showing an active s..
Council should not bow to development or political pressure, says city councilor, Khoo ‘Politicians should be ‘wakil rakyat’ and n...
Seeking solutions: Penang Forum member and soil expert Dr Kam Suan Pheng giving her views during the dialogue session themed ‘Penang Fl...
It’s hard to deny when the effects of climate change are all around us  Andrew Sheng says that from increasingly intense hurricanes t...
Why did MBPP approve the Tanjung Bungah development project? Read more at https://www.malaysiakini.com/letters/399357#qbRd534yu1JfC551....
https://youtu.be/kslhytLg-Wc Hills, landslides and floods: What to do?   The mega floods in Penang which followed the landslide...
Choong (in white) surveying the deforested hillslope next to Majestic Heights. PENANG MCA has raised concerns about the safety of the r..
https://youtu.be/4qaOB1n5tgA GEORGE TOWN: The Penang Island City Council has lodged a police report against the consultant of the aff...

Wanted: Leaders who listen !

Turning a blind eye: The grumblings over exposed hills are growing louder but little is being done to rectify the situation


 

Grievances from residents warning of environmental damages must not fall on deaf ears


“Leaders who don’t listen will eventually be surrounded by people who have nothing to say.


MY family home in Kampung Melayu, Air Itam in Penang, is more than 56 years old. That’s about my age, and it has never been hit by floods. Not once!

But last week, my parents – dad is 92 years old and mum, 86, – had their sleep rudely interrupted sometime after 1am by water gushing into their home.

They have been sleeping on the ground floor for years now because they are too old to climb the stairs to their bedroom.

The water that flowed into their room almost touched the top of their bed but fortunately, one of my nephews and his wife from Kuala Lumpur were staying over that night.

It was so fortunate that they were there to calm my anxious parents down and assure them all would be fine. They managed to comfort my stunned folks, who had never experienced such an unpleasant situation before. My father had to be carried to the room upstairs as the house remained flooded throughout the early morning.

Our home was filled with layers of mud the next day and the cars parked outside were all damaged. They sadly look like write-offs.

My father’s pride and joy, his first-generation Proton Saga car – which he bought in 1985 – is now unusable.

A week on, my brothers and nieces are still cleaning up the mess from the massive flood. They haven’t had the time or mood to even assess the financial losses.

And bound by a common sentiment as Penangites, they are tired of the blame game, a trade the state’s politicians have plied to near-perfection.

How many times can the finger be pointed at the previous government, with the incumbent almost 10 years in power? And how many more times can we blame it on torrential rain, which came from Vietnam – or wherever? Worst of all is, when discussions are mooted on flood issues, the voices of the people are swiftly silenced.

It appears that even to talk about hillslope development, one would have to contest in the elections, or be perceived to be challenging the state government, or more extremely, be some kind of lackey in cahoots with the Federal Government.

Blaming everyone else except oneself is simply a way of covering up one’s weaknesses. But the discerning public, in a maturing democracy with heightened transparency and a huge middle class like Penang, will not tolerate such short-term manoeuvring for long.

Suddenly, civil society – a buzzword among politicians – has vanished, with NGOs now regarded as irritants and an affront to the state establishment. Politics is apparently the monopoly of politicians now.

As the National Human Rights Society aptly puts it, “With the benefit of hindsight, we are sure that the Penang government now realises that they should not so readily malign civil society, howsoever obliquely – for the legitimate and well-founded articulation of matters of great concern to civil society.

“This is because it undermines the fundamental values of a functioning democracy and the fundamental human rights of the populace at large.”

Perhaps, the state political elites, many of whom aren’t pure blood Penangites, don’t realise the state is the home of a vibrant civil society, with many active NGOs and activists who are respected influencers of society.

Having walked through the corridors of power and appreciated power’s pleasures, perks and the adulation it brings, maybe it is becoming much harder for people to take criticism. This is, in fact, a reflection of the arrogance of power.

Many have developed thin skin now, with little tolerance for the slightest form of criticism. If anyone even dares raise their voice, an army of cybertroopers, hiding behind anonymity, are unleashed to attack them.

Freedom of speech, it seems, is only the domain of the opposition, with some media (regarded as unfriendly) unceremoniously ridiculed and questioned for their attendance at press conferences.

There are politicians from the Federal Government, too, who are shamelessly cashing in on the flood situation in Penang.

Their relief work must be splashed across news pages, and they have to be seen wading through the flood waters for dramatic purpose. Phua Chu Kang’s iconic yellow boots could likely be the hottest item in the state, as politicians bask in the media’s glare.

Ridiculous remarks have also been passed, one even blaming the state government, saying it has earned the wrath of God.

The rain and floods will go away, eventually. Penangites are stakeholders in the state, and they don’t only make up politicians. The state doesn’t belong to the state government or the opposition.

Caught up in the thick of the action, we seem to have forgotten that the hills are crumbling even without rain. As a stern reminder, just last month, a landslide buried some people in Tanjung Bungah. Investigations on that tragedy are still ongoing.

Basically, the trees – which act as sponge on the hills – are gone. We don’t need to be soil experts to know that.

The grumblings are growing louder because the hills have been progressively going bald in recent years. But the voice of discontent has fallen on deaf ears.

Penangites are alarmed at what they are seeing, and they don’t like it one bit, as much as they understand that land is scarce on the island and property developers need to source some to build homes on.

While it’s easy to hang the Penang state government out to dry for its follies, it’s difficult to ignore how the floods in the east coast states have become annual affairs, too. So, what effective flood mitigation plans have been put in place there?

Kelantan has suffered senselessly, and after more than a year of having been subjected to Mother Nature’s havoc, many victims have yet to recover from their losses. Flooding is obviously nothing exclusive and doesn’t discriminate. Every state has, unfortunately, experienced it in some shape or form.

So, irrespective of location, when life returns to normal, you can expect the politicians to resume their old denying ways.

If there’s a thread that binds our politicians – regardless of which side of the political divide they come from – it is their inability to apologise for their mistakes, despite waxing lyrical about accountability.

Don’t expect them to say sorry, because an apology would be admission of guilt, or worse, a sign of weakness in their realm of inflated egos.

And to put things into perspective, perhaps we could learn a lesson from a quote by prominent American pastor Andy Stanley – “Leaders who don’t listen will eventually be surrounded by people who have nothing to say.”


On the beat Wong Chun Wai

Wong Chun Wai began his career as a journalist in Penang, and has served The Star for over 27 years in various capacities and roles. He is now the group's managing director/chief executive officer and formerly the group chief editor.

On The Beat made its debut on Feb 23 1997 and Chun Wai has penned the column weekly without a break, except for the occasional press holiday when the paper was not published. In May 2011, a compilation of selected articles of On The Beat was published as a book and launched in conjunction with his 50th birthday. Chun Wai also comments on current issues in The Star.

Related posts:

Behind BJ Cove houses at Lintang Bukit Jambul 1 is an IJM Trehaus Project. 

Becoming bald: A view of the clearing work seen at Bukit Relau which was visible from the Penang Bridge in November last year. GEORGE...
 
https://youtu.be/QB45Q2_mOG0 Suspicious activity: A photo taken from Penang social activist Anil Netto's blog showing an active s..
 
Council should not bow to development or political pressure, says city councilor, Khoo ‘Politicians should be ‘wakil rakyat’ and n...
 
Seeking solutions: Penang Forum member and soil expert Dr Kam Suan Pheng giving her views during the dialogue session themed ‘Penang Fl...
 
It’s hard to deny when the effects of climate change are all around us  Andrew Sheng says that from increasingly intense hurricanes t...
 
Why did MBPP approve the Tanjung Bungah development project? Read more at https://www.malaysiakini.com/letters/399357#qbRd534yu1JfC551....
 
https://youtu.be/kslhytLg-Wc Hills, landslides and floods: What to do?   The mega floods in Penang which followed the landslide...
 
Choong (in white) surveying the deforested hillslope next to Majestic Heights. PENANG MCA has raised concerns about the safety of the r..
 
https://youtu.be/4qaOB1n5tgA GEORGE TOWN: The Penang Island City Council has lodged a police report against the consultant of the aff...
 
 

Saturday, November 11, 2017

Penang landslides & flooding are natural disasters man-made?

It’s hard to deny when the effects of climate change are all around us


 Andrew Sheng says that from increasingly intense hurricanes to regional landslides and flooding, it’s clear our actions are effecting the environment. But, it’s also evident that there are ways for us to avert disaster and change course


AFTER two Category 5 hurricanes (Harvey and Irma) hit the US in October, followed by Maria hitting Puerto Rico, no one can deny that natural disasters are devastating.

With three hurricanes costing an estimated US$385bil, with less than half insured, the poor are suffering the most because they cannot afford to rebuild as the rich.

This year alone, monsoon floods in Bangladesh, India and Nepal have left millions homeless. This year will therefore break all records as Munich Re-insurance data suggests that 2016 natural disaster losses were only US$175bil, already 28.6% higher than the 30 years (1986-2015) annual average of US$126bil.

But how much of these natural disasters are man-made?

Despite US President Trump being sceptical of climate change, the US Global Change Research Program Climate Science Report published this month concludes that “it is extremely likely that human activities, especially emissions of greenhouse gases, are the dominant cause of the observed warming since the mid-20th century”.

Carbon dioxide concentration already exceed 400 parts per million, last occurred about 3 million years ago, when both global average temperature and sea level were significantly higher than today. Roughly one third of carbon emission is due to residential heating/cooling, one third for transport and one third for industrial production.

Human activities on Mother Earth include over-consumption of natural resources, cutting down forests, polluting waters and excessive cultivation/development that caused desertification or soil erosion. You see this from warmer surface and oceanic temperatures; melting glaciers; diminishing snow cover; shrinking sea ice; rising sea levels; ocean acidification; and declining tree and fish stock.

Oceans warming up

Hurricanes are caused by oceans warming up, building energy and vapour levels that create freak typhoons, tornados and massive downpours. At the same time, droughts are also occurring with more frequency for longer.

Scientists estimate that global average sea level has risen by about 7-8 inches since 1900, with almost half that rise occurring since 1993. Everyday, we hear new extreme events, such as unusually heavy rainfall, heatwaves, large forest fires, floods or landslides.

Climate warming is most observable in the water-stressed Middle East and the North Africa/Sahel region, where rapid population growth created desertification, food shortages, civil conflicts and ultimately, outward migration towards cooler climates, especially Europe. This hot region accounts for 60% of global war casualties since 2000, with 10 million outward refugees. About 90% of the world’s refugees and asylum seekers come from four regions with half under the age of 18 years.

A 2016 World Bank report estimated that these water-stressed countries’ GDP could be reduced by up to 6%, with dire consequences on stability. Without water, industries cannot function, food cannot be cultivated and health can deteriorate due to disease from water-shortage and drought.

European estimates suggest that each refugee costs roughly US$11,600 per person to maintain and there are already one million trying to enter Europe last year. The OECD has classified countries such as Afghanistan, Central African Republic, Iraq, Somalia, Sudan, Syria and Yemen as extreme fragile.

Critical point

The world is already reaching a critical turning point. If the Paris Climate Accord can be implemented, with or without the United States, there is some chance of averting further global warming.

But closer home, we are already witnessing the effects of climate change on our daily lives.

In 1972, Hong Kong experienced a devastating landslide near Po Shan Road in Mid-Levels, which caused 67 deaths and collapse of two buildings. One cause was unstable ground following heavy rainfall from Typhoon Rose eleven months prior to the incident.

This tragedy in densely populated Hong Kong resulted in rigorous slope protection and inspection of drains to ensure that these slips do not occur again. I lived near Po Shan Road and admired how Hong Kong engineers regularly inspected the slope protection measures and that the drains were always clear.

In 1993, the collapse of Highland Towers in Kuala Lumpur was partly attributed to the clearing of the hilltop above Highland Towers, which led to soil erosion and the weakening of the foundations. By the time the residents detected cracks in the buildings, it was already too late. Some of my personal friends were among the 48 persons who were killed in that collapse.

Last weekend, Penang (where I live) had the worst rainstorm and floods because we were hit by the tail end of strong winds from Typhoon Damrey, one of the strongest to hit Vietnam in 16 years, leaving 61 people dead. Driving along Penang Bridge, I can see that the continued hilltop developments in Penang are leaving soiled scars on the previously pristine landscape, I am reminded of Highland Towers and Po Shan incidents. Natural disasters are acts of god, but the size of their impact on human lives are completely within our control.

Soil erosion

Soil erosion does not happen overnight, and require responsible developers and conscientious governments, as well as concerned citizens, to be continually vigilant that maintenance of roads and drains, including soil inspections, are serious business with serious consequences.

Modern technology can provide drones and inbuilt sensors that can detect whether erosion is reaching critical levels. Regular maintenance of drains and checks on stability of the soil, especially where there has been recent clearing of trees in steep slopes, will forewarn us all of impending accidents.

As cities are building more and more on hillsides subject to torrential rain, Penang should seek technical expertise from Hong Kong which has extensive expertise on the maintenance of steep hill slopes that are subject to typhoons and sudden rainfall.

Landslides are today used more in political terms than in real terms. The next time landslides happen, residents who watch daily the erosion of their natural environment will know who is really looking after their interests.

Andrew Sheng 




Related links:

No hill land approvals since 2008?

by penangforum
Former MBPP councillor Dr Lim Mah Hui wrote this piece for the press in his personal capacity: I wish to comment on the press statement by Jagdeep Singh Deo as reported in Berita Daily and many other newspapers on 24 October.

PKR rep cries for a stop to hillside development - Nation

Related posts:


Behind BJ Cove houses at Lintang Bukit Jambul 1 is an IJM Trehaus Project.  Approximate Coordinates : 5°20'38.47"N,100°16'...
Becoming bald: A view of the clearing work seen at Bukit Relau which was visible from the Penang Bridge in November last year. GEORGE
Choong (in white) surveying the deforested hillslope next to Majestic Heights. PENANG MCA has raised concerns about the safety of the r...

Why did MBPP approve the Tanjung Bungah development project? Read more at https://www.malaysiakini.com/letters/399357#qbRd534yu1JfC551....

Becoming bald: A view of the clearing work seen at Bukit Relau which was visible from the Penang Bridge in November last year. GEORGE...
Seeking solutions: Penang Forum member and soil expert Dr Kam Suan Pheng giving her views during the dialogue sessio
Council should not bow to development or political pressure, says city councilor, Khoo ‘Politicians should be ‘wakil rakyat’ and n...
https://youtu.be/kslhytLg-Wc Hills, landslides and floods: What to do?   The mega floods in Penang which followed the landslide...
Speaking out: Penang Forum members protesting outside the CAP office in George Town. Don’t just make it about worker safety  

https://youtu.be/QB45Q2_mOG0 Suspicious activity: A photo taken from Penang social activist Anil Netto's blog showing an active 
 
GEORGE TOWN: Penang has tabled a higher deficit state Budget of RM740.5million for the next fiscal year of 2018. Chief Minister Lim Guan ...
Humans Are Destroying the Environment   PETALING JAYA: They are supposed to be guardians of the environment, and yet “certain enforcem..